Connector assembly solution

36/48 pin connector pin, bending, assembly, test line

Scheme Introduction

Main process:

Pin/bending station

Sealing ring installation station

Conducting high voltage test station

CCD visual test station

Height detection station

Laser coding station

Automatic installation station of dust cover

Defective product offline station

Manual offline/packaging station

Main paraMeters:

-Beat time: 10 seconds

Yield rate of production line: ≥ 99%

Production line efficiency: ≥ 90%

Scroll to Top