Scheme Introduction
Technological Process:
1. Takt Time
Order number | Production line index | Index value | Remark |
1 | Meter | Final assembly line, 90-100S/set; | |
2 | Working hours | 300 days/year, double shift system, 10 hours per shift |
|
3 | Capacity | 200000/year | |
4 | Changeover time | Within 15min |
2. List of Product Types
Product model | Part name | Weight (KG) | Complete machine (length x width x height mm) | remarks |
Three-in-one motor | Water-cooled/oil-cooled motor | Within 85-150kg | About 475 * 470 * 344 | The actual size shall prevail |